Reply to comment

H & H Study

Your Gardens are a treasure

As stated in our conversation, I am begining the Hyrology and Hydraulic study. The process is complex and time consuming and will in all takle about 4 to 5 months to complete with my current time demands. The study as mentioned will be done at no cost to you other than if surveying is needed to provide critical elevations and dimensions.

Information needed follows:
1) A cross section through the dam from upstream to downstream,
2) A cross section through the dam from bank to bank, and
3) Details on the outlet works
All the above with elevations and dimensions.

If these do not exist now then we can make approximations for now and details could be added later to refine the analysis as time and resources permit. If you do have drawings or sketches please send copies or I can come up and get the details needed for the analysis.

My contact information follows:

Dennis C. Urban,P.E.
846 Aylesbury Drive
Gahanna, OH 43230

(614) 619-7101 Cell
(614) 855-7728 Residence
urban660128@yahoo.com eMail

Best wishes,

Dennis Urban

Reply

The content of this field is kept private and will not be shown publicly.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <code> <ul> <ol> <li> <dl> <dt> <dd>
  • Lines and paragraphs break automatically.

More information about formatting options